Airtherm Engineering's reputation for providing a quick response to clients needs was highlighted by a recent flue installation at student accommodation in Manressa Street (off Kings Road), Chelsea, London.
The client contacted our office to request an engineer to attend site, survey and provide a price the same day. After our initial survey we offered our cost proposal for consideration, after which an order was issued but only on the provision that we could install both flues within 48 hours due to exceptional time constraints.
The product required was in stock and the installation was completed within the 48 hour deadline, much to the delight of our client.
Consultant: Shaylor
Client: MVS Ltd
Sector: Education
Products: MasterFlue System
Equipment: Andrews Water Heater
Application: Atmospheric
Water Heater: Andrews Water Heaters
Model: Ecoflo EC380/1900
Application: Chimney / Flue system
Operating mode: Wet
Pressure: Positive
Working pressure: 200 Pa (product will operate 1000pa max)
Inner wall: 316L1.4404/1.457 thickness Ø250 0,4 mm
Outer wall: AISI 304/ 1.4301 thickness 0,5mm
Insulation: None
Sealant : Tri-lip 'o' type silicone ring
Fuel type: Gas
For more information: www.airtherm.co.uk
Pages
Labels:
Flues,
Masterflue,
Quick installation
Case Study - Manressa Street (off Kings Road), Chelsea
Posted by
Airtherm Engineering Ltd
Monday 14 January 2013
Subscribe to:
Post Comments (Atom)
Blog Subscription
-
Follow me
You can follow my updates on Twitter
-
Join My Network
Be a part of our business network
-
Facebook
Become a fan of our blog on Facebook
Search this blog
Popular Posts
-
Airtherm Engineering has completed another installation using Nova commercial product serving two existing Potteron Derwent atmosperic boi...
-
Airtherm Engineering recently completed the installation of a twin wall, fire rated, flue system at the new £20 Million Signature Care Home ...
-
Airtherm worked closely with the contractor AC Preou Limited with the supply and installation of two boiler house refurbishments of Reay Hou...
-
During December 2012, Airtherm Engineering worked closely with the contractor at Raich Leisure Centre in Sunderland to complete the install...
-
Airtherm Engineering Limited has recently completed a flue dilution installation, working closely with the consultant and contractor at Gra...
-
Our new Natural Ventilation brochure for 2014 is available to download from our website. Our Natural Ventilation & Lighting brochure...
-
Airtherm Engineering Ltd are proud to announce that we have successfully achieved the SAFEcontractor accreditation for 2014. This means ...
-
Airtherm Engineering's reputation for providing a quick response to clients needs was highlighted by a recent flue installation at stud...
-
Airtherm Engineering Limited are pleased to announce the appointment of Mr Richard Hattersley, who joins our business in the capacity of A...
-
Working closely with Sandwell MBC, Airtherm Engineering have recently completed the new installation of a kitchen ventilation system,...
Labels
- Accreditations (1)
- Addensbrooke House (1)
- Air Conditioning (3)
- Air Source Heat Pumps (2)
- Ansul (1)
- Broag (1)
- Broag Remeha (1)
- Camden Academy (1)
- Can-iVent (1)
- CanVent (2)
- Capel Manor (1)
- Case Studies (1)
- CHAS (1)
- Chimneys (5)
- CIBSE (3)
- Clyde (2)
- Comfort Cooling (3)
- Construction Online (1)
- Control Systems (3)
- David Brown (1)
- Fire Suppression (1)
- Flues (23)
- Grange Farm Primary (1)
- Grilles (1)
- Hamworthy (5)
- Heat Pumps (2)
- Heat Recovery (1)
- Kitchen Canopies (10)
- Kitchen Ventilation (9)
- Louvres (1)
- Masterflue (10)
- Natural Lighting (4)
- Natural Ventilation (11)
- New address (1)
- Nova (2)
- Photovoltaic (2)
- Quick installation (1)
- Renewables (4)
- Safecontractor (3)
- Sales Agents (6)
- Single Wall (2)
- Solar PV (2)
- Solatube (1)
- Tividale Hall Primary School (1)
- Twin Wall (14)
- Ventilation (5)
- Wind-iCalc (4)
- Wind-iVent (8)
0 comments:
Post a Comment